The Conceptual Framework of Design Change Effects in Some Project Delivery Systems
Anak Agung Gde Agung Yana Prof. Ir. Rusdhi, H.A. Ir. M Agung Wibowo, MM, MSc. Ph.D
Volume : 776 Nomor : 776 Published : 2015, July
Trans Tech Publications
Abstrak
Changes will always occur in project construction and can not be avoided. Many factors can cause changes in the construction project. Most dominant factors of cause of changes in project construction is design change. Design changes will have bad impact on the performance of construction projects, especially the performance of cost and performance time. Many factors can be the cause of design changes. Knowing the factors that cause a design change and knowing its behavior is very important to do. Knowing factor and behavioral of design changes that occur in project construction, and then can be managed properly, it will can be reduce the occurrence of design changes in projects construction. With the reduction of design changes will be able to improve the performance of construction projects, especially at cost and time performance. Construction projects carried out by using a project delivery system. Each project delivery system used will have different contractual relationships, rules, and responsibilities of each party involved. These differences will lead to in the occurrence differences in design change in project construction. Selection of appropriate project delivery system to complete a construction project is needed. The purpose of this paper is to provide a conceptual framework that can be used to determine the behavior, and the effect of design changes on project construction at some project delivery system used.